Case study  /  Live-site M&E

Fire detection for a battery storage room at a leisure centre.

Battery storage had been installed at a busy public leisure centre, but the store room holding it had no fire detection.

Project summary

Project summary.

Client or site type
Leisure Energy · Public leisure centre, battery storage room
Scope
Fire detection installation, testing, sign-off and certification
Value band
[Value band, where approved]
Duration
[Duration] · overnight working
Constraints

Operational constraints

The leisure centre is busy and open to the public every day. Closing it during the day to fit the system would have cost the operator money, so the works had to happen while the centre was closed.

Challenge

The challenge

Leisure Energy had installed battery storage at the leisure centre, but the store room holding it had no fire detection. The room needed it quickly. Closing a busy public leisure centre during the day to fit it would have cost the operator money.

Governance & delivery

How Primus governed and delivered the works.

We mobilised and worked overnight, so the centre opened as normal each day. [Primus lead] managed the installation, testing and handover.
Technical

Technical solution

[System type, detection devices and the interface with the battery storage installation.]

Handover

Commissioning and handover

The installation was tested, signed off and certified to [standard, for example BS 5839-1]. [Primus lead] managed the handover.

Outcome

Measurable, client-approved outcome.

The fire detection was installed, signed off and certified to [standard, for example BS 5839-1] without the centre closing.

Client quote

“
“[Quote from Leisure Energy]”
[Name, role]

Primus project lead

[Primus lead]
Next step

Discuss a similar project.