Battery storage had been installed at a busy public leisure centre, but the store room holding it had no fire detection.
Project summary.
Operational constraints
The leisure centre is busy and open to the public every day. Closing it during the day to fit the system would have cost the operator money, so the works had to happen while the centre was closed.
The challenge
Leisure Energy had installed battery storage at the leisure centre, but the store room holding it had no fire detection. The room needed it quickly. Closing a busy public leisure centre during the day to fit it would have cost the operator money.
How Primus governed and delivered the works.
Technical solution
[System type, detection devices and the interface with the battery storage installation.]
Commissioning and handover
The installation was tested, signed off and certified to [standard, for example BS 5839-1]. [Primus lead] managed the handover.
Measurable, client-approved outcome.
The fire detection was installed, signed off and certified to [standard, for example BS 5839-1] without the centre closing.
Client quote
Primus project lead