Capacity growth and ageing cooling plant can force major change while the data hall stays in service. Primus plans both the technical work and the controls around it.
Ageing equipment, extra capacity, or customers asking for higher-density racks.
A live data hall has to stay within its temperature limits throughout any change. That means working around customer load, planning for the hottest months, and keeping the room in spec every step from first disconnection to final commissioning.
Primus runs the technical work and the controls around it as one package: phased sequencing, temporary cooling where it is needed, and a method agreed with the operations team before anyone opens a cabinet.
Six stages, each planned around the hall’s cooling margin.
Sequence the works so the hall never drops below its cooling margin at any step.
Hire or bridge units where load, weather or capacity needs it. Sized to the actual load.
Chilled-water, condenser, BMS and power interfaces identified and controlled before kit arrives.
Live temperature and humidity watched through the switchover. Trip points agreed with the client.
Method, risk register and change log kept against impact on the live operation.
Witnessed tests against the agreed criteria. Loop tuned under real load.
Four disciplines, delivered as one package around the live hall.
Yes. Works are phased so the hall never drops below its cooling margin, with temporary cooling where load, weather or capacity needs it. Temperature and humidity are monitored through every switchover against trip points agreed with you.
When taking a unit out would leave the hall short of margin, or when works fall in the hottest months. Temporary units are hired or bridged in and sized to the actual load in the hall.
Yes. Hot and cold aisle containment, blanking and sealing can be fitted in a live hall, followed by rack-level airflow checks and thermal mapping to show the change has worked.
Yes. BMS integration, alarm and set-point review and loop tuning are part of the controls package, so the new plant reports into your site monitoring at handover.
Witnessed tests against the agreed criteria, with the control loop tuned under real load. Results, settings and O&M information are handed to your operations team.
Share the hall, the load profile and your temperature limits. We will come back with a method and sequence.